click for the homepage
mobile menu button

Contact Us

apply 2

Apply

report 2

Report

pay 2

Pay

Home > Building Control > What's new in Building Control

What's new in Building Control

LABC News & Updates

Latest News From LABC - regular updates about the industry, building tips and practical information from LABC.

LABC Inspection Request App

Did you know you can book a site inspection with one our building control surveyors while you're on the move? Use the link below or head to the App Store or Play Store

Download the LABC app

Babergh & Mid Suffolk LABC Custom Build Guide

Babergh & Mid Suffolk LABC Custom Build Guide

Building Regulation Part B Update

We have an update on a change to the Building Regulations with regards to Part B and combustible cladding on buildings. We have a new regulation 7(2) of the Building Regulations 2010 which applies to any building with a storey at least 18m above ground level and which contains:

  • one or more dwellings; or
  • an institution; or
  • a room for residential purposes (excluding any room in a hostel, hotel or a boarding house).

This includes residential blocks of flats, student accommodations, care homes, sheltered housing, hospitals and dormitories in boarding schools with a storey above 18 m in height. Regulation 7(2) requires that all materials which become part of an external wall or specified attachment achieve European Class A2-s1, d0 or Class A1 except for components exempted in Regulation 7(3). The definitions of external wall and specified attachments are included in Regulation 2. These definitions include any parts of the external wall and balconies, solar panels and sun shadings.

There are transitional arrangements that apply with the Amendment Regulations come into force on 21 December 2018. The Amendment Regulations will not apply where a building notice or an initial notice has been given to, or full plans deposited with, a local authority before 21 December 2018 and either the building work to which it relates:

(a) has started before that day; or

(b) is started within the period of two months beginning on that day.

The attached Circular Letter from MHCLG has full details along with links to updated editions of the Approved Documents for Part B and Regulation 7.

Babergh & Mid Suffolk Building Control Fees

We have made some changes to our Building Control standard charges tables. These changes will come into effect from the 1st September 2017, these changes will apply to both authorities.

New Suffolk Guide To Converting Your Home

Guide To Converting Your Home

Part P Information